Wednesday, April 6, 2016

Enki drawing continues.

So I needed to create a new table of offsets to match the frame spacing on the second construction drawing of Enki. This will allow the frames to support the deck of the boat as well as eliminate frames in foot-wells.





After finishing 90% of the second construction drawing I knew the frame placement worked. I liked the location of the rowing-well and seating areas, it was time to up the scale of the drawing and make the last set before finishing the build plan and beginning construction.

The final lines drawing is 1 1/2" to 1'.



I plan on creating construction drawings at this scale as well, so stay tuned. Also the Table of offsets is complete however I have not added it to the drawings yet.