Got the fixtures for the IRH's stem and transom built and installed on the strong back.
After I got then into place i started putting battens on to see how the lofting turned out.
The curve in the bow is to much for the batten but i think i will be able to get it in plywood. The stern looks great, i cant wait to see what the panels look like.
No comments:
Post a Comment